Monaro Street is closed between Lowe Street and Atkinson Street with detours in place for the Monaro Street Refresh project.
Find out more
The Waste Minimisation Centre has officially sold out of mulch. Mulch products will no longer be available at the facility moving forward. Compost is still available to purchase.
• Bungendore Waste Transfer Station -12 SEPTEMBER 2026 - 210 Tarago Road Bungendore - Saturday - 8am - 11am• Braidwood Waste Transfer Station -12 SEPTEMBER 2026 - 117 Bombay Road Braidwood - Saturday - 1pm - 4pm• Queanbeyan Waste Minimisation Centre -13 SEPTEMBER 2026 - 5 Lorn Road Crestwood - Sunday - 8am - 11am See our events page for more details.
Araluen Road has been reopened to traffic, with the three bridges replaced. Sealing of the approaches was completed on 29 July 2026.
The three heritage bridges were removed in early March 2025. As part of the project, the bridge timbers were offered to local community groups for community projects that would showcase the timber's heritage significance.
The old bridge timbers were delivered to:
Project background
We received $4,636,500 as part of the NSW Government’s Fixing Country Bridges program to replace the series of three timber bridges within 130m of each other on Araluen Road.
The Jembaicumbene bridges are between 6.6m and 37.2m in length and will be replaced with concrete structures. This will reduce maintenance costs, improve resilience to natural disasters and fire, improve safety and usability by increasing bridge widths from single-lane to two lanes. The bridges were showing signs of failure and their replacement will provide reliable heavy vehicle passage.
The works include:
Site establishment works began in early February 2025.
This project is proudly funded by the NSW Government.
Jembaicumbene-bridges-replacement-bridge-3-concrete-and-reinforcement-works-for-abutments.jpg
Jembaicumbene-bridges-replacement-loading-bridge-timbers.jpg
Jembaicumbene-bridge-1.jpg
Jembaicumbene-bridge-2.jpg
Jembaicumbene-bridge-2-completed.jpg
Jembaicumbene-bridge-2-view-of-midspan-piers.jpg
Jembaicumbene-bridges-major-flooding-2-July-2025.jpg
View-of-Jembaicumbene-bridges-from-Araluen-Road-south.jpg
Araluen Road, Reidsdale 2622 View Map
Araluen Road , Reidsdale 2622
Review of Environmental Factors(PDF, 7MB)
Notification for Residents - February 2025(PDF, 1MB)